Remote Access

Project Info

  • Category

    Bored Piles

Description


Interconnector Pylon Foundations

On a remote moorland location in Ayrshire, Scottish Power required foundation piles for 3 new electricity pylons.
Piles required to be designed for tension and compression loads, drilled into rock. 108 piles in total.

Pylon locations were not accessible by road or track and situated in a peat bog.

All materials and platform mats were flown in by helicopter.