Driven Piles in restricted access
Client: Dickie Construction
Works Contractor: M G Construction Ltd
| The school required piles for a new extension within a pended courtyard. |
 |
Conventional piling could not be carried out due to this restriction.
The school required to remain operational throughout this piling contract. |
 |
This was achieved using a tracked midi rig with 0.5 tonne drop weight installing 273 mm cased piles. |
 |
|